Alarm Docs
  • Submit Article
  • Contact Us
  • About Us
  1. Home
  2. Accessories
Searching...

Accessories

  • EVD-2 wiring with 2 additional EVD-R

    Recommended Wiring EVD-2 System (Shown with 2 additional EVD-R remote pickups). Recommended Wiring Figure 4 shows the recommended wiring for an...
  • OPTEX Beams: Master/slave selector switch setting

    The master/slave selector switch is provided for preventing cross talk between infrared beams for multi-level alarm. From the top level,...
  • OPTEX Beams: Wiring

  • OPTEX Beams: Terminal connections

    Do not exceed the voltage or current rating specified for any of the terminals during installation, doing so may cause...
  • HUSK-20: Installation guide

    The HUSK-20 is a mechanical hold-up switch designed for silent operation. It is activated by using one finger to press...
  • 324P: Installation Sheet

    The Model 323 and 324P are wire-in transformers on a mounting plate to be installed in any 350 or 350A...
  • ELK-924: High current switching

    Wire jumpers are used to tie Relays “A” and “B” in parallel for high current switching. Currents as high as...
  • ELK-924: Dual switch

    The relays are used to switch two different The ELK-924 is powered by the control panel and triggered by a...
  • AX-350DH: Terminal connections

    Do not exceed the voltage or current rating specified for any of the terminals during installation, doing so may cause...
  • SMP5: Power Supply/Charger

    SMP5 power supply/charger converts low voltage AC input into 6VDC, 12VDC or 24VDC @ 4 amp of continuous supply current...
Next

Other Articles

  • OPTEX Beams: Terminal connections
  • HUSK-20: Installation guide
  • OPTEX Beams: Wiring
  • ELK-924: Dual switch
  • SMP5: Power Supply/Charger
  • EVD-2 wiring with 2 additional EVD-R
  • SMP3 – Power Supply/Charger
  • OPTEX Beams: Master/slave selector switch setting
  • AX-350DH: Terminal connections
  • ELK-924: High current switching
  • 324P: Installation Sheet
© Copyright 2026 - AlarmDocs.Com